Much of the hydro fleet in North America and Europe was commissioned in the 1940s and 50s and is now going through life-extension refurbishment. The civil works and the machines stay; the drive components have to be made again.

Send us a drawing or a sample

Power generation drives we work on

Refurbishment programmes are planned years ahead, which suits how we work. The components are rarely available and almost never catalogue items.

Refurbishment gearing

Replacement gears and shafts for life-extension programmes, manufactured to the existing geometry so the original housings and civil works are untouched.

Gate and valve drives

Operating gear, worm sets and shafts for intake gates, wicket gates and penstock valves, including hand-operated legacy mechanisms.

Reducer rebuild

Strip, inspect, report and rebuild for balance-of-plant drives: handling, cooling, ash and screening.

What refurbishment programmes need

On plant this age the drawings are often incomplete and the suppliers are long gone.

What failsWhat we supply
Worn wicket gate operating gearReplacement gearing and shafts to the measured geometry
Governor drive gearbox with no partsInternals reverse engineered from the removed components
Intake gate drive worm set wipedMatched worm and wheel manufactured as a pair
Trash rake gearbox beyond repair limitsRebuild with new gearing, journals restored
Crane hoist gearing crackedNew gear set to the existing centres
Pump shaft journals wornShaft machined complete to the original fits

Working from no drawings

Most of the drive components we are asked for are no longer manufactured, and the original drawings are long gone. We reverse engineer from the worn part itself: the component is measured, the tooth geometry and fits are established, material is confirmed, and a replacement is cut to suit the existing housing, shafts and bearings so nothing else in the assembly has to change.

Where a gear has failed because of a design limitation rather than wear, we will say so and propose the change rather than reproduce the fault.

Shop capabilities

We repair all major gearbox makes, including Flender/Siemens, SEW-Eurodrive, Nord, Sumitomo, Falk/Rexnord, David Brown, Hansen, Lenze, Bonfiglioli, Brevini, Renold and Philadelphia Gear.

Quality and documentation

Euro Gear holds ISO 9001:2015 certification (certificate 14144280, issued by QA Certification, valid to September 2029; verifiable at www.irqao.com), covering engineering, reverse engineering, custom design and R&D for gears, gearboxes and industrial mechanical components; custom manufacturing, precision machining and fabrication; inspection, repair, rebuilding, upgrades, anti-wear coatings and testing of industrial equipment; technical consulting, maintenance support and reliability solutions. Material certification, dimensional reports, traceability records and test bench reports are supplied as specified in the quote. Euro Gear is a member of the American Gear Manufacturers Association (AGMA).

Where we work

From our engineering and manufacturing facility in Saint-Hubert, just south of Montreal, and our US operation in northern New York, we serve plants across Quebec, Ontario and Atlantic Canada and the northeastern United States, and ship across North America. Service is available in English and French.

Lead times

Standard gearbox repairs typically take two to four weeks, depending on parts and the extent of the damage, and we plan around shutdown and turnaround dates. When a drive fails without warning, our 24/7 breakdown response dispatches technicians to plants across Canada and the United States, and our field team also handles on-site inspection, alignment, installation and commissioning.

Common questions

Our station was commissioned in the 1950s and we have partial drawings. Is that a problem?
No. Incomplete drawings are the normal starting point for this work. We establish the geometry from the components and the assembly.
Can you supply to a multi-year refurbishment schedule?
Yes, and planned programmes are what we are built around. Long lead times booked in advance suit us better than emergency work.
Do you manufacture turbine runners?
No. We make gearing, shafts and drive components, not hydraulic turbine runners.
Do you work with the main electromechanical contractor or directly with the station?
Either. On large refurbishments we are often a sub-tier supplier to the main contractor.
What certification do you hold?
ISO 9001:2015. Material certification and traceability records are supplied as specified in the quote.

Send us the part

A photograph of the nameplate and the worn component is usually enough for us to tell you whether we can help. Drawings are welcome but not required.

Contact Euro Gear